Boat park Slip Resurfacing Project Day 2
5th September
Complete cutting concrete at the top of the slipway (if needed).
Breakout concrete at the top the slipway (hired digger and driver). Remove broken out concrete by wheelbarrow.
Cleaning slipway edges and slipway.